Two residential towers and a podium on a constrained site over rail tunnels in London.

on site

A new — unanticipated — structure for the roof of an existing mall, to accommodate two restaurants, an extra food court and a kids zone.

on site

Structural efficiency generates considerable savings for the frame design of a five-block project in Watford, UK.

on site

Six commercial buildings that are a key part of a new IT park for TRIL. Schematic design for the first structure is complete.

in design

An optimised frame and construction approach results in substantial materials savings — for a seven-tower residential project.

on site

A three-part high-rise residential PRS development that incorporates partial re-use and extension of an existing basement.

completed

New five-star hotel with distributed accommodation across a steep site, plus a three-level reception/dining complex.

on site

Three new education buildings of varying formats ranged around a sports field at the Talegaon campus of DY Patil University in Pune.

on site
January 2019

The Boiler House shortlisted for Best Use of Timber Technology

December 2018

Five sites centred on a major transport hub, with 1,000 new homes